Interior Services in Thane, Mumbai & Navi Mumbai

Looking for a modular kitchen contractor, false ceiling specialist, or full home interior designer near you? Star Art Works offers POP & gypsum ceilings, custom wardrobes, bathroom remodeling, painting, plumbing, electrical, and complete 1BHK–3BHK renovations — measured on site, quoted clearly, finished by one in-house crew.

What You Get

Modular Kitchen, False Ceiling & Full Interior Craft — One Transparent Team

Every service below is executed by Star Art Works' own artisans across Thane, Mumbai, and Navi Mumbai — measured on site, quoted with clear line items, and finished to a 50-point quality standard. Browse each service, then book a free site visit or see completed work.

Modular kitchen design and installation in Thane Mumbai Most Popular

Modular Kitchen Solutions

Customized L-shape, U-shape, parallel, and island kitchens crafted with moisture-proof BWP marine plywood, high-gloss acrylic finishes, quartz stone counters, and Blum soft-close fittings.

  • 100% Waterproof Marine Plywood
  • Blum & Hafele Soft-Close Tandem Drawers
  • Quartz & Granite Countertops
POP gypsum false ceiling with LED cove lighting In-House Master Craft

Gypsum & POP False Ceilings

Precision-engineered Gypsum board false ceilings, decorative POP moldings, ambient LED cove lighting channels, magnetic track lights, and acoustic soundproofing.

  • Saint-Gobain Gyproc Certified Boards
  • Warm LED Cove & Spot Light Fixtures
  • Crack-Free Smooth Surface Finish
Full Home Interior Turnkey Renovation

Turnkey Full Home Interiors

Complete flat transformations: living room TV paneling, Italian marble / vitrified tile installation, wall fluting, decorative lighting, and Asian Paints Royale velvet wall finishes.

  • Complete 1BHK, 2BHK & 3BHK Turnkey Scope
  • Custom TV Units, Console Tables & Louvers
  • Premium Paint & Wallpaper Artistry
Custom Wardrobes

Custom Wardrobes & Storage

Floor-to-ceiling sliding wardrobes with tinted glass profile doors, walk-in closets, hydraulic storage beds, and integrated dressing mirrors.

  • Heavy-Duty Soft Close Sliding Track
  • Termite-Proof Commercial Plywood
  • Customized Internal Organizer Layouts
Bathroom remodeling by Star Art Works

Bathroom Remodeling & Tiling

Total bathroom dismantling, polymer waterproofing, micro-grouting, large-format vitrified wall tiles, floating vanity units, and sanitary fitting (Grohe/Jaquar).

  • 100% Leakproof Polymer Coating
  • Concealed Diverters & Rain Showers
  • Custom Stone Vanity Countertops
Electrical and AC installation with ceiling work

Electrical & AC Work

Concealed copper wiring (Polycab/Finolex), distribution boards, Schneider/Legrand modular switches, and concealed AC copper lines with split-AC mounting.

  • Heavy-Duty Fire-Retardant Wires
  • Smart Home Automation Switchboards
  • Split-AC Mounting & Copper Piping
Plumbing and interior finishing

Plumbing Services

Pressure-tested CPVC/UPVC supply lines, drainage planning, fixture and tap installation, and geyser or RO points — coordinated with waterproofing on bathroom and kitchen jobs.

  • Pressure-Tested Leakproof Pipes
  • Fixture, Tap & Geyser Point Installation
  • Drainage & Waterproofing Coordination
Interior painting and bedroom finish Premium Wall Artistry

Interior & Exterior Painting

Asian Paints Royale Velvet Touch, texture painting, stencil artwork, PU wood polishing, anti-fungal exterior coats, and 100% waterproof primer preparation.

  • Asian Paints & Berger Certified Colors
  • Luxury Velvet & Metallic Texture Wall Art
  • Waterproof Base Putty & Primer Application
Every Room, Covered

Spaces We Work In

Whichever part of the home needs attention, we bring the right trade to it — from the living room down to the passage.

Living room interior by Star Art Works
Living Room
Guest Room
Kitchen
Wardrobe
Bedroom
Toilet & Bathroom
Balcony
Passage
Transparent Quoting

Know Exactly What You're Paying For

Every service quote is based on a free site visit — not an online calculator.

01

Free Site Measurement

We measure your space, check existing finishes, and confirm the exact scope for the services you need.

02

Material Options

Choose finishes and brands with clear cost differences explained upfront — gypsum, acrylic, laminate, hardware.

03

Fixed Line-Item Quote

Get a PDF with itemized work, timeline, and total. Lock it in before any site work begins.

Ready to Get Started on Your Service?

Book a free site visit and get a fixed, line-item quote for whichever service you need — no hidden charges.

Book Free Site Inspection ➔