
A wardrobe is used every day, so the door style and internal layout matter as much as the finish.
Sliding wardrobes
Doors glide on a track, so no floor space is needed for swinging doors. They are a good fit for bedrooms where the bed sits close to the wardrobe. The trade-off is that you can only open part of the wardrobe at a time.
Hinged wardrobes
Doors swing open, giving full access to everything inside at once. They need clear floor space in front, but they are simple, familiar and work well with mirrors and glass inserts.
Walk-in wardrobes
If you have a spare corner or room, an open or walk-in wardrobe gives the best visibility and storage, though it needs more area and good lighting.
Plan the inside before the outside
- Long hanging section for sarees, kurtas and coats
- Short hanging section for shirts and tops
- Drawers for innerwear and accessories
- Loft storage for suitcases and off-season bedding
- A pull-out for ties, belts or jewellery
Details worth paying for
Soft-close channels and hinges, a moisture-resistant carcass, and sensor lights inside make a noticeable difference to everyday use.
Quick guide: choose sliding when floor space is tight, hinged when you want full access, and walk-in when you have room to spare.


