Most plumbing problems in a renovated home are not caused by the pipe itself but by a poor joint or the wrong pipe for the job. Still, it helps to know the three materials you will hear about and where each one belongs.
CPVC
CPVC pipes are rated for both hot and cold water, which makes them a common choice for concealed supply lines in apartments. They are joined with solvent cement, and the joint needs the right cement, a clean cut and enough curing time before the line is pressurised.
PPR
PPR pipes also handle hot and cold water. They are joined by heat fusion, which creates a joint that is part of the pipe itself when done correctly. This needs the right fusion equipment and a trained installer, because a joint that is under-heated or over-heated will be weak.
UPVC and PVC
UPVC is widely used for cold water lines and for drainage and soil pipes. It is not meant for hot water, so it should never be connected to a geyser line. Check the pipe class and use fittings made for the purpose.
Where each one belongs
- Hot and cold supply inside walls: CPVC or PPR.
- Drainage and waste lines: pipes made for drainage, laid with a proper slope.
- Geyser connections: only pipes and fittings rated for hot water.
Installation matters more than the label
A good installer makes clean cuts, uses matching fittings, supports the pipe at proper intervals and allows for the pipe to expand and contract on hot lines. A poorly joined pipe from a good brand will still leak.
Insist on a pressure test
Before the walls are closed and tiles are laid, the lines should be filled and tested under pressure for the time recommended by the pipe manufacturer. Many contractors keep the lines under pressure while the tiling is done so any damage shows up immediately.
Layout tips that prevent trouble later
- Keep joints out of slabs and as few as possible inside walls.
- Fit shut-off valves so one bathroom or the kitchen can be isolated for repairs.
- Plan points for the RO, washing machine and dishwasher before the walls are closed.
- Photograph the pipe layout before tiling.
Do not mix and match: use fittings made for the pipe type you chose. Mixing fittings from different systems is a common reason for leaks that only appear after a few months.